Working title: Example: last man standing.
We are going to recreate the video of last man standing but with our own ideas which is typical to this genre of the music. This product will be a free running base video. They will be jumping off walls climbing and sprinting, there will be fight scenes since the song is about the last man standing so these are some of the general characteristics of this type of genre, and these characteristics will attract and appeal to the target audience. A big characteristic we need to include in this type if video is the make sure the cuts in the scenes are exactly to the beat or the target audience will notice this and wont be as intrigued as if it did have the correct cuts.
Roles assigned:
Tom Oswell- Main Actor/ Main Editing The main role in the video was assigned to Tom because he can do some free running and he was willing to do it for our music video. He can also edit so this role was assigned to him becase he has done editing before and as the general idea of how to edit for our music video.
James Edwards- Actor/Editing Jim has a role as a actor because he was capable of doing what was need for the music video. Jims second role was to help tom edit the music video and do some editing by himself.
Harry Lawton-Jones- Actor /Main CameraMan The role of Camera man is assigned to harry because he wanted to be the camera man and he was able to different type of shots if necessary. Harry is also an actor because he was need for a apart in the video and did what he had to do for the video.
Tom Hyman- Director/ Actor The role of the director was assigned to Tom because he told the camera man which type of shots were need, got some of the actors to do what was necessary for the video, Tom was also and actor because he was part of the video.
The estimated time for our production and editing process will be around about 3 weeks.
The production cost would be £600 but this would include the cost of all the camera equipment and software which we already have.
The locations we have chosen to be in our video are around wem is the park, back of the white lion, different ally ways around wem. The editing computer sites will be in final cut.
Schedule:
Date: 28th February till the 11th March.
Time. Meetings 4th February, 7th March, 18th March
AOB3 Deadline 17th February
AOB4 Deadline 28th February-25th March
AOB5 Deadline 31st April
Our equipment required will be a camera and tripod. We won’t need sound recording equipment. Our video will be shot it day so we wont need lighting equipment. We will need editing equipment on the computer such as final cut.
Contingency plans: we will be working on Harry’s blog so we will all have his password for when he isn’t hear. If a piece of the equipment broke we would all provide funds to replace the equipment. If the weather is wrong and not sunny for when we are filming our video we will adapt and tweak things so we can sort out a different method of how we are going to film. Because people could get injured form the free running in our video from the weather. E.g. icy conditions.